| |
Tesoro
Anacortes, WA
Cat Cracker Structure
Pederson Bros. fabricated, assembled, fireproofed and delivered a new structure in three modularized sections. Pictured is the base structure which weighed in excess of 70,000 lbs. and was over 14' square.
Total project of over 1,000 tons of structural steel and miscellaneous metals(platforms, handrails, grating, etc).
|